Researcher William H East. This page will be updated and expanded as construction develops.
Below is a picture of a once earthen, now a lighted box beam pre-stressed concrete bridge over a seasonally dry river bed in San Jacinto California.
The removal of the earthen bridge and the construction of this one on Lake Park Dr in San Jacinto cost $6.9 million. The bridge was completed in 2001. There were no lawsuits. This bridge is 1040 feet long and 48 feet wide. The proposed bridge for Regents Road is 870 feet long and 102 feet wide for six lanes, 92 feet wide for four lanes.
Reference: Habib Motlagh, San Jacinto City engineer